Northern Energy Capital / EWT

Yukon, Canada

Haeckel Hill Wind Project

 

Mueller Enterprises Ltd. was proud to be a key contributor to the Haeckel Hill Wind Project, a milestone in renewable energy for the Yukon. Located just outside Whitehorse, this development marked a major shift in territorial energy policy—paving the way for independent power production and the installation of the first utility-scale wind turbines in the region.

In ideal wind conditions, the Haeckel Hill turbines generate up to 4 megawatts of clean energy—enough to power between 400 and 900 homes. This significantly reduces reliance on diesel generation during the winter months, cutting emissions and promoting a more sustainable energy future in the North.

Mueller’s Role at Haeckel Hill

Mueller Enterprises Ltd. was responsible for delivering critical electrical infrastructure to support the commissioning and long-term operation of the site. Our scope included:

• Supply and installation of all switchgear and transformers

• High-voltage and low-voltage cabling

• Construction of the substation

• Ground grid installation for the turbines

• High-voltage terminations

• Ongoing maintenance and technical support

Burwash Landing Wind Project

Mueller also supported Northern Energy Capital and EWT at the Burwash Landing wind site. Our team assisted with:

• Inverter installation support

• Continued maintenance and operational assistance

Outcome

By delivering reliable and expertly executed electrical systems, Mueller Enterprises Ltd. helped bring the Yukon’s renewable energy vision to life. The Haeckel Hill and Burwash Landing projects stand as a testament to what’s possible when forward-thinking energy policy meets practical, on-the-ground expertise.

Client: Northern Energy Capital / EWT

Location: Yukon, Canada

Electrical Contractor: Mueller Enterprises Ltd.

SAFETY GUARANTEE

OUR CLIENTS

OFFICE LINE

1.800.555.6789

EMERGENCY

1.800.555.0000

WORKING HOURS

9:00am – 6:00pm